Lighting & Fountain Guides

Standalone and Remote Musical Fountain Control

Choose standalone and remote fountain control around the work your operating team needs to perform. Define who starts a show, who changes the schedule and what should happen when the network is unavailable before choosing equipment.

Define standalone operation

Standalone commonly describes playing a prepared programme without keeping the programming computer involved. Where shows are stored, how they are selected, scheduling and restart behaviour all depend on the model and configuration. Ask the supplier to demonstrate the exact tasks your staff will use.

Specify each remote task

  • View the current status and approved schedule.
  • Start a show within the operator’s permissions.
  • Change operating times within an agreed role.
  • Update content or configuration through the approved process.
  • Provide diagnostic information where supported.

This list is a requirements checklist, not a promise that every controller includes these features. Confirm each function against the selected equipment and deployment.

Agree the response to lost connectivity

Specify whether the system should continue a locally stored schedule, move to an approved state or wait for an operator. The solution provider must confirm the supported behaviour and conditions. Internet loss and other interruptions need separate procedures matched to the actual installation.

Hand over access by role

Operators, programme approvers and support technicians may need different permissions. Agree who can view, start shows and edit configuration, and who removes access when staff change. Transfer account details through the agreed handover channel; public project documents should not contain credentials or internal administration addresses.

Commission the operating workflow

  1. Run the approved shows and schedules.
  2. Check that each role can perform only its agreed tasks.
  3. Test connection loss and recovery using a plan prepared by the technical team.
  4. Record programme versions, backups and supported recovery procedures.
  5. Train the staff who will operate the fountain after handover.

Continue planning your project

Project brief · Controller selection · Costs and quotations · Operation and maintenance · Wafaifo project

Tell us about your project

Send your location, site layout and intended water or lighting effects. We can discuss a suitable scope and the information needed for the next step.

Contact ARTTEC